Our customer needed the means to send ore to either their new remote bin system or to the shaft hoisting system.  They needed to have this diverter system fit with minimal head room to minimize future ground stability issues by minimizing the open wall height.  CMI designed a diverter system that fit within 11 feet of overall back height.  This system incorporated an engineered chute system to minimize dust generation at this transfer.

2web